Minnkota Power Cooperative

Demand Response Log


Date

Time

Area
Load
Group
DO
9
DO
10
DO
11
DO
12
DO
13
DO
14
DO
15
DO
16
DO
17
DO
18
DO
19
DO
20
DO
21
DO
22
DO
23
DO
24
06-July-2013 03:51:42 ALL 1.01 ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON
06-July-2013 07:34:03 ALL 1.02 --- --- --- --- --- --- --- --- --- ON --- --- --- --- --- ---
06-July-2013 11:59:57 ALL 1.02 --- --- --- --- --- --- --- --- --- --- ON --- --- --- --- ---
06-July-2013 18:25:53 ALL 1.01 ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON
06-July-2013 18:28:07 ALL 1.02 --- --- ON ON ON ON ON ON ON ON ON ON --- --- --- ON

Load Group Categories:

  • 1 - Short-Term Loads (water heaters)
  • 2 - Intermediate-Term Loads (storage heat)
  • 3 - Long-Term Loads (dual heating furnaces, back-up generators)
  • 6 - Summer-Only Loads (irrigation, cycled air conditioning)
  • 9.99 - Internal Network Transmission